|
Guangzhou's
subway is based on the cross-design subway network and was designed to
service the planned three-sector city.
The # 1 line runs east-west,
starting in the east with the Guangzhou Steel Station and heading west
to the East Guangzhou Train Station, a total of 18.48 kilometers and 16
stations.
# 2 line runs north-south, starting
in the north with New City Shima and travelling south to Chigang in the
Haizhu District, a total of 26 kilometers with 22 stations.
# 3 line starts in the north
at the Tianhe Athletic Center and continuing south to Xinzhou in the Haizhu
District, a total distance of 13 kilometers with 9 stations.
The three subway lines form a
ring, and the downtown are to be within the reach of the subway.
|